New Jersey DEP Compliance Advisory!

NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION
#2023-24     Issued: 12/7/2023

COMPLIANCE ADVISORY

REMINDER TO TAKE ACTION TO COMPLY WITH ENHANCED VAPOR RECOVERY EQUIPMENT REQUIREMENTS BEFORE DECEMBER 23, 2024


WHO IS AFFECTED BY THIS ADVISORY?

Owners and operators of any gasoline dispensing facility (GDF) constructed in New Jersey before November 9, 2017. A GDF is any stationary facility that dispenses gasoline into the fuel tank of a motor vehicle, which makes it subject to New Jersey Air Pollution Control rules for gasoline transfer operations.


WHY IS DEP ISSUING THIS ADVISORY?

On December 23, 2017, the New Jersey Air Pollution Control rules (N.J.A.C. 7:27-16.3) were amended to include Enhanced Vapor Recovery (EVR) standards, established by California Air Resources Board (CARB), which aim to improve the effectiveness of gas pump vapor recovery systems, reduce vapor leaks from underground storage tanks, reduce evaporation from hoses and nozzles between use, redesign of nozzles to reduce drips, enhanced diagnostics to alert attendants when vapor recovery equipment malfunctions and improve the long-term reliability of vapor recovery equipment. The regulations were implemented in two phases. Phase II standards, which
primarily affected hoses and nozzles and the decommissioning of older gas pump vapor recovery systems, was completed in December 2020. Phase I standards, which primarily involve the tanks, piping, and fill ports, require that affected equipment be “CARB EVR-certified” on or before the deadline of December 23, 2024.


CLICK HERE TO VIEW THE COMPLIANCE ADVISORYNJ DEP


Feel free to contact us at 1.800.451.4021 or Email Us with any further questions or to place an order!


The John W. Kennedy Company appreciates your business and continued support!

JWK USA Logo

Omntec CLD Series| Portable Containment Sump Tester

DID YOU KNOW…

…That sumps are required to be tested every 3 years for tightness according to EPA Regulation 40 CFR Part 280.35?
Here area few links to check out the text of the regulation: Govinfo.gov and EPA.gov.Omntec CLD Series Portable Sump Tester

Third-Party Certified For 15 Minute Test

The CLD Series Sump Tester is available in one to eight probe versions. Each system is conveniently stored in a durable case equipped with wheels for ease and accessibility.  Pull up, set up, and test in as quick as 15 minutes. Results print out and can be stored internally.

Each system includes:

  • (1) Case with wheels
  • (1) PROTEUS OEL8000III-CLD* microprocessor-based controller with printer
  • (1) RS-232 port
  • (*) MTG-probe input connectors (1 per probe)
  • (*) MTG-probes with suspension chains with “s” hooks (1 per probe)
  • (*) 50ft MTG-probe cables (1 per probe)
  • (1) 12ft three-pronged power cord
    *quantities reflect CLD Series version purchased (ie. CLD 1, 2, 3, 4 ,5 , 6 7, & 8)
CLD Series Model Options
(includes all components above – click model # to see in our web store)
CLD3 – 3 MTG probes w/ 2″ stainless steel float per probe
CLD4 – 4 MTG probes w/ 2″ stainless steel float per probe
CLD6 – 6 MTG probes w/ 2″ stainless steel float per probe
CLD8 – 8 MTG probes w/ 2″ stainless steel float per probe

Omntec CLD Series Sample Print Out

ADVANTAGES

  • Third-Party Certified
  • Ease in programming
  • Tests are stored within the on-board microSD card
  • Flexibility and adaptability to different State and Federal regulations
  • Easy to understand graphical touch-screen display prompts

Omntec CLD Series O - M Manual
Omntec
CLD Series
O & M Manual
Omntec CLD Series Product Brochure
Omntec
CLD Series
Product Brochure
OmntecCLICK HERE to check out ALL Omntec Monitor Systems we currently have in our web store
Omntec Shop By ImageCLICK HERE to check out Omntec Monitor Systems Shop By Image feature

And if you can’t find what you are looking for contact us at 1.800.238.1225 or email us.

The John W. Kennedy Company appreciates your business and continued support!
JWK USA Logo

URGENT: ALL current GVR Safety Certifications will expire December 31, 2018 – Take Action Now To Stay Certified!!

JWK Technical Training ClassesURGENT: ALL current GVR Safety Certifications will expire December 31, 2018, regardless of when the certification was taken!!

As of January 1, 2019, technicians will be required to have the API Safety Certification in the USA and the POST Safety Certification in Canada.

 

You can read the updated Gilbarco / Veeder-Root Pathway to Certification Sequence document here to learn about the latest changes to the GVR requirements.

You can also see the updated API/POST document here that includes link to the:
USA Safety Requirement API WorkSafe site: https://worksafe.api.org/DesktopDefault.aspx
Canada Safety Requirement POST Training site: https://learn.posttraining.ca/login/index.php

View our updated our 2019 Tech Training Class Schedule here.

Download the updated 2019 JWK Tech Training Enrollment form here.

 

If you have any further questions or concerns, you can contact Chris Bedard, our GVR Certified Trainer at ceb@jwkemail.com or call Chris at 1.855-978-6737.

The John W. Kennedy Company appreciates your business and continued support!

JWK USA Logo

What you need to know to be EPA compliant by the Oct. 13, 2018 Deadline

OPW - EPA CompliantOPW’s Guide To 2018 EPA Regulations

Get compliant and avoid fierce penalties!

OPW has put together a quick reference guide for everything you need to know to be compliant with the new EPA testing requirements.

Download OPW’s EPA Regulations guide to gain access to information from brochures, videos and articles to help you prepare for the October 13, 2018 compliance deadline.  Please be sure to indicate the specific OPW EPA-Compliant testable products for which you would like to receive additional information.

7 Ways Your Underground Fueling System can Save You MoneyAside from getting some background on why the new regulation exists, who and what it affects, specifics about testing and what happens for non-compliance, it also includes 7 Ways Your Underground Fueling System Can Save You Money.

So download your copy of OPW’s EPA Regulations guide today!

Please feel free to contact us at 1.800.451.4021 with any questions about compliance, OPW’s guide or to order OPW products!

The John W. Kennedy Company appreciates your business and continued support!

JWK USA Logo

Are You Ready For 2018?

OmntecNew EPA Regulation 40CFR, part 280, requires sumps to be tested every 3 years, starting in 2018.

Omntec sump tester price listOmntec offers the CLD Series portable containment sump tester, available in 3, 4, 6 , and 8 probe versions.

CLD Kit List Prices:

CLD3: Three Probe Sump Tester Kit- $11,537

CLD4: Four Probe Sump Tester Kit- $12,656

CLD6: Six Probe Sump Tester Kit- $16,203

CLD8: Eight Probe Sump Tester Kit- $19,080

Click here for more details on the CLD Series, and be sure to call us at 1-800-451-4021 with any questions.

 

The John W. Kennedy Company appreciates your business and continued support!

JWK USA Logo

 

NOW AVAILABLE ONLINE: Myers Tank Vacuum Test Components

Myers Vacuum Test Kit

We now offer the  Myers Tank vacuum test components. You can either purchase all the individual components in a kit or individually.  One of the featured components is the BJ Enterprises (Husky Corp.) Jarhead remote tank sensor that works as a standalone manual reading gauge or in conjunction with the 007 electronic tank gauge.

As with just about everything we stock that we offer online or that you can buy over the phone, your order ships the same day if received by 3PM Eastern TimeAnd if you see something on our site you can’t place in your shopping cart or doesn’t show any available quantity from our stock, please give us a call at 1.800.238-1225 as many products can be shipped same day, factory-direct to you!

 

 

Please do not hesitate to call us at 1.800.238.1225 if you would like to learn more about Myers Tank vacuum test components or any of the other products we offer!

We appreciate your continued business and support!

JWK 2017 MYSSA Logo