A Word From Universal Valve About Spill Prevention

Universal Spill PreventionThe following has been reproduced from Universal Valve email dated 12/15/2016

Unfortunately, environmental Hazards are located all over the forecourt, not just the fill area. By using a spill container, we can protect the environment at the fill location. But what about all the other tank risers, and access points? In a perfect world, every tank fill situation will go as planned and not a drop of fuel will hit the environment. Yet history shows that proper planning is needed for when things do not go as planned.

The new EPA rules help make sure sites are checked and operated properly. But what happens when a tank is overfilled and the perfect storm arises? There are other access points to contend with that could leak petroleum directly into the environment. Here are three common tank access risers that need attention.Universal Valve 70C Spill Container

  • Vapor recovery risers. Typically, a spill container with no drain is the ideal solution. Eliminating the drain is ideal. There is less of a chance of water entering the tank with no drain.
    • Check Out Universal Spills such as the 70C-1212

 

 

  • Tank Monitoring risers. Standard spill containers are not the ideal solution here. Using a tank monitoring spill container offers electrical conduit hookups while creating water tight solutions for incoming ground water and environmental protection from tank overfills.

 

 

 

 

  • Universal JH69-4 Stick Port FlapperStick Port Risers. Standard spill containers work well here. Like the vapor recovery container no need for a drain valve. Be sure to use a cap and adapter on the riser that is clearly marked “DO NOT FILL”. Installing a stick port flapper helps reduce vapors through the riser when removing the cap.

 

 

 

 

  • Be sure to mark all of these spill containers clearly for their purpose. Marking the lids is not the only place you’d want to mark the container. Adding a concrete marker next to the unit is a safe bet. It eliminates the problem of the lids being crossed up and/or replaced with a non-marked lid.

The John W. Kennedy Company appreciates your business and continued support!
JWK Winter Logo

OPW Announces New FibreTite Multiport Spill Container

opw-fibretiteOPW has announced their new FibreTite Multiport Spill Containment System, which is now CARB EVR approved.  These containers are designed with a lightweight composite cover for long-term water tight performance and meet all CARB and EVR requirements, as well as being certified for use on all existing standard gasoline Phase 1 Vapor Recovery Certification Phase 1 EVR Executive Orders.  Among the features included are an integrated inspection port system, a removable flange in the container base, and a composite lift cover and optional levered plumber seal covers for easy access.

 

For additional information, check out the distributor bulletin and the official part brochure.

 

 

 

The John W. Kennedy Company appreciates your business and continued support!

JWK Logo

Update: MassDEP Stage I/II Registered Facilities’ Compliance

massdep-logo

Dear Stage I/II Facility Owner/Operators and Stakeholders,

 

An updated spreadsheet, “Massachusetts Stage I & II Facilities’ Compliance Certification Due Dates & Status”, is now posted on our MassDEP Stage I / II Vapor Recovery website.

 

Please note the revised spreadsheet was posted on 9/9/16.  An updated spreadsheet will be posted in October.

 

The spreadsheet can be viewed and downloaded at this link:

 

http://www.mass.gov/eea/agencies/massdep/air/programs/stage-ii-vapor-recovery.html

 

The spreadsheet is located in two sections on the website;

 

  • “Stage I Vapor Recovery Certification Forms” section, and

 

  • “Stage II Vapor Recovery Certification & Decommissioning Forms” section.

 

 

Please Review the Following:

 

 

  1. Registered Stage I / II facilities:

 

The spreadsheet lists Stage I or Stage II facilities that are registered in the MassDEP Stage I / II database.

 

 

  1. Reasons you cannot find a facility or certification form on the report:

 

There are a number of scenarios why you cannot find a facility or current certification form on the report:

 

  • A Stage I / II facility has not registered with the MassDEP Stage I/II program.

 

  • The annual Stage I or Stage II certification form, or Stage II decommissioning form, was not received by the Stage I/II program.

 

  • Tanks were removed at a facility, and the Stage I/II account was closed, but the Stage I/II program was not notified that new tanks were installed.

 

For example, a facility removes an underground storage tank (UST), but does not register a newly installed aboveground storage tank (AST) with the Stage I program.  ASTs are applicable to the Stage I Vapor Recovery Program and must register with MassDEP by submitting the applicable Stage I certification form, either a Stage I Form A or Stage I Form C,

 

 

  1. Data Fields and comments:

 

Facility ID:                                            The “Facility ID” is Stage I/II ID number, NOT the UST ID number.

 

Company Name:                              Company name, facility name, and facility address currently on record in the Stage I / II database.

Facility Name:

Facility Address:

Facility Town/State/Zip

 

Tank Type:                                          Indicates if an underground storage tank (UST) or aboveground storage tank (AST) is installed.

 

Class:                                                     Indicates if the facility is registered as a Stage I facility (STG1), or Stage II facility (STG2).

 

CARB #/Sys Type:                            Indicates the Stage II CARB number, Stage I CARB number, or Stage I system type.

 

Test Cycle:                                          Stage II facilities have three test cycles; Third Annual, First Annual, and Second Annual.

 

Stage I facilities have one test cycle, First Annual, since the same tests are required every year.

 

Form Sent:                                          The date the applicable Stage I/II form was generated by MassDEP.

 

Form:                                                    The type of form sent to the facility or received.

 

Form C –              Stage I or Stage II Form C (refer to “Class” type)

Form D1 –            Stage II Form D1 (no test required)*

Form D2 –            Stage II Form D2 (test required)**

Decom –               Stage II Decommissioning form

 

*             Facilities eligible for Stage I Form D1’s will be generated starting in 2017.

**           Facilities eligible for Stage I Form D2’s will be generated starting in 2018.

 

Test Date:                                           Most recent Stage I/II compliance testing date.

 

Postmark Date:                                 Date the completed form was mailed or emailed to the MassDEP Stage I/II program.

 

Due Date:                                            Compliance Due Date for the applicable Stage I/II annual certification form.

 

Form Rcvd & Complete?               Complete –         Form was received and is complete.

Incomplete-       Form was received but sections of the form are Incomplete.

Not Received –  Form has not been received.

Suspended –      Form has not been received and enforcement was issued.

 

 

  1. Calculating Due Dates:

 

 

Decommissioned Facilities:

 

Facilities that have submitted Stage II decommissioning forms can be calculated as follows:

 

Decommissioning test date + 60 days + 1 year = First Stage I Form C due date.

 

For example, if MassDEP received a decommissioning form with a  test date of 12/22/15 the next due date will be…

 

12/22/15 + 60 days + 1 year = 2/22/17

 

For decommissioned Stage II facilities the Stage I/II database will generate the first Stage I Form C based on this formula.

 

 

Next Due date for certification forms received:

 

A certification due date is determined by the postmark date on the envelope of your previous year’s certification submission to MassDEP.  This approach ensures that all Stage I and Stage II systems are certified at least once every 12 months.

 

For example, if a facility’s Year 1 certification is postmarked March 23, the facility will be required to mail its next certification to MassDEP by March 23 of Year 2.  If, however, the facility mails its Year 2 certification more than 30 days before the facility’s currently applicable due date (for example on February 20), the due date for its Year 3 certification will be February 20, and not remain March 23. Future certification due dates for certifications mailed less than 30 days before their currently applicable due date will remain unchanged.

 

If maintaining your facility’s current certification due date is important to you, simply schedule your compliance tests for no more than 30 days in advance of that date.  You may also schedule your tests and submit your certification at any time before your due date if you wish.

 

If you have any questions, please contact:

Jeff Gifford

MassDEP

Bureau of Air & Waste

Stage I / II Vapor Recovery Program

1 Winter St., 7th floor

Boston, MA 02108

 

Phone: 617-556-1144

 

The John W. Kennedy Company appreciates your business and continued support!

JWK Logo

New OPW 723V Pressure Vacuum Vent

OPW Corporate Logo

 

 

 

OPW 723VOPW has announced the release of the new 723V Pressure Vacuum Vent, which is designed specifically to meet all California Air Resources Board Enhanced Vapor Recovery (CARB EVR) requirements and is certified for use on all existing standard gasoline Phase 1 Vapor Recovery Certification Phase 1 EVR Executive Orders.  In addition, it also complies with the Nation Fire Prevention Association’s (NFPA) 30 requirements for venting gasoline vapors.    The 723V comes in both 2″ and 3″ NPT thread models, and is available for stocking now.  For more information, check out the official distributor bulletin and product datasheet from OPW.

 

 

 

The John W. Kennedy Company appreciates your business and continued support!