JWK Overstock Online Specials Update!

Black Knight Mechanical Tank GaugeOver 100 Products from Dozens of Manufacturers2018 First Quarter Overstock Specials

We have added a number of products to our online OVERSTOCK SPECIALS at drastically reduced prices, ranging from 30% to 75% off manufacturer’s suggested list price, more than a few well below our cost!

Save big on anything from overfill prevention valves, lighting products, dispensers, pumps, meters,  containment products, repair kits, graphics, replacement electronic boards and more from brands such as, APT, Bravo, Fill-Rite, Gasoline Advertising Products, Gilbarco, Husky, Evertite,, LSI Lighting, NOV (Ameron & A.O.Smith), OPW, Scully, Veeder Root and others.

The BJ Enterprises 99″ Black Knight liquid level tank gauge w/ horizontal float with a list price of $233.17 that we typically sell online for $163.20, ONLINE NOW FOR ONLY $136.00*!

Check back constantly as we are always adding to our overstock specials and reducing prices throughout the year.

And here are just a handful of the current special deals you’ll find on our
OVERSTOCK SPECIALS Page:
Item List
Price
Regular
Online
Price
Now
Only
Discount
381 Nation Spencer Barrel Pump 381 National Spencer Barrel Pump $47.70 $33.71
$11.93*
75% Off
List Price!
346DI Morrison Brothers External Emergency Valve 346DI-0600AV
Morrison Brothers 3″ Ductile Iron External Emergency Valve
$604.05 $463.91
$145.20*
75% Off
List Price!
LSI Lixington Decorative Pedestrian Area Light 580207 Crossover Lexington Decorative Pedestrain and Area LED Light Fixture $1,600.00 $1,280.00 $800.00* 50% Off
List Price!
CWSVH45BL CWS Service Station Vacuum 15' x 2" Hose CWSVH45BL CWS Service Station Vacuum 15′ x 2″ Hose $66.20 $22.07 $16.55* 75% Off
List Price!
M01047A007 Gilbarco Right Nozzle Boot Assembly w/ Lift To Start Lever M01047A007 Gilbarco Right Nozzle Boot Assembly w/ Lift To Start Lever $189.32 $143.88 $94.66* 50% Off
List Price!
*While supplies last

If you have any questions about any of the products you find on our overstock specials page, feel free to call us at 1.800.238.1225!

The John W. Kennedy Company appreciates your business and continued support!

JWK USA Logo

Introducing The OPW Matador Composite Cover

OPW Matador Composite CoverA polyethylene skirt with flare prevents corrosion and rust

OPW has introduced a new manhole into the game that boasts a composite cover along with a special structural fiberglass reinforcement matrix and flared, polyethylene skirt.

 

The Matador is available in 37 (37.5) and 42 inch sizes, offering a plain and cam-lock version of each size and was recently highlighted on Convenience Store News.

You will find all four variations of the Matador currently offered by OPW listed in the John W. Kennedy web store with web store pricing and links to the product page and supporting documentation on the OPW web site.

Features

  • Slip-resistant tread pattern
  • Water resistant
  • Easy removal and replacement
  • Stainless steel recessed handle
  • Exceptional deflection performance
  • Long-life performance – comparable to heavier competitor models in cycle tests
  • Special structural fiberglass reinforcement matrix
  • Two mounting options
  • Roto-Lock Option – for providing a secure locking mechanism without the need to locate threaded bolt holes on the mounting ring. The Roto-Lock offers quick and easy access while maintaining a secure sump application.
  • Painted steel frame
  • Polyethylene skirt with flair
  • H20 Rating – Exceeds Highway Specification – 20 (H20) Rating.
  • Flared skirt allows equivalent water percolation to 39” and 44” covers

Materials

  • Cover: Fiberglass
  • Ring: Painted steel
  • Skirt: Polyethylene
  • Recessed Handle: Stainless steel
  • Roto-lock: Ductile iron

To learn more or to place an order for the Matador, visit us online or call us at 1.800.451.4021!

 

The John W. Kennedy Company appreciates your business and continued support!

JWK USA Logo

OPW Introduces New DEF Breakaways & Swivels!

OPW Corporate LogoOPW Breakaways and SwivelsTo coincide with the release of their Industrial 19DEF nozzles, OPW is releasing a series of compatible DEF breakaways and swivels.  The 19D series (the 19DB Reconnectable Swivel Breakaway, 19DHS Barbed Hose Swivel, and 19DS Single Plane Hose Swivel) can be used with either the NPT or BSPP threaded 19DEF nozzles.  The 19D series breakaways and swivels are manufactured entirely out of stainless steel and other ISO22241 materials.

Also available from OPW is the 19DEF series of nozzles and related products.  Click here to read the official 19DEF series product brochure.

 

 

 

The John W. Kennedy Company appreciates your business and continued support!

JWK USA Logo

MassDEP Stage I Enforcement Discretion Directive: OPW 723V PV Vent Approval

OPW Corporate Logo

The following is reproduced from an OPW newsletter.

 

The Massachusetts Department of Environmental Protection (MassDEP) is proposing to amend 310 CMR 7.24(3) Distribution of Motor Vehicle Fuel, to update the tables of Stage I systems certified by the California Air Resources Board (CARB) since January 2, 2015, the date the current Stage I regulation was last revised.

The existing regulations at 310 CMR 7.24(3) is part of the Massachusetts Ozone State Implementation Plan (SIP) and the regulatory amendments will be submitted to the U.S. Environmental Protection Agency (EPA) for approval into the SIP.  A public hearing will be held to receive comments on the proposed amendments on:

August 1, 2017
10am – 12pm
Conference Room A
MassDEP Boston Office
1 Winter Street, Boston 02108

Testimony may be presented orally or in writing at the hearing. MassDEP will accept written comments until 5:00 p.m. on August 31, 2017.  Written comments must be submitted by email to: DEP.Talks@state.ma.us or by mail to: Tom DeNormandie, MassDEP, One Winter Street, Boston, MA 02108.  A copy of the proposed amendments and technical support document is available on MassDEP’s website at mass.gov/dep/public/publiche.htm.

Stage I Vapor Recovery Enforcement Discretion Directive
for Owners/Operators of Motor Vehicle Fuel Dispensing Facilities Subject to
310 CMR 7.24(3)

OPW 723VAttached is an Enforcement Discretion Directive, effective immediately, allowing the installation of Stage I enhanced vapor recovery (EVR) systems and components that are contained in California Air Resources Board (CARB) Orders issued since January 2, 2015 prior to the effective date of revisions to 310 CMR 7.24(3).

 If you have any questions concerning the proposed amendments to 310 CMR 7.24(3), or the conditions of the above directive, please call the MassDEP Stage I hotline at 617-556-1035, ext. 1, or Jeff Gifford at 617-556-1144; jeffrey.gifford@state.ma.us.

 

To learn more about the 723V pressure vacuum vent, Download the 723V Data Sheet/Flyer.  Or call us at 1-800-451-4021.

 

The John W. Kennedy Company appreciates your business and continued support!

JWK USA Logo

OPW Videos Now Available Through WWW.OPWGLOBAL.COM

OPWUniversity

OPW has made their OPW University training videos free and accessible on their main website with no login or account required.  Accessing these videos is simple:

From the home page, access the Tech Support menu and select either Fuel Management Systems or Retail Fueling.  Depending on which you select, the menu path selection will be as follows:

FMS: TECH SUPPORT > OPW FUEL MANAGEMENT SYSTEMS > TRAINING & CERTIFICATION > OPW UNIVERSITY VIDEOS

RETAIL FUELING: TECH SUPPORT > OPW RETAIL FUELING > TRAINING > OPW UNIVERSITY VIDEOS

If you have any question or would like to find out more about OPW technical training, contact us at 1-800-451-4021.

The John W. Kennedy Company appreciates your business and continued support!

JWKRI 2017 Logo

JWK Trade Show – March 29 & 30, 2017 – SAVE THE DATE!!

Yes, it is that time once again when the John W. Kennedy Company presents our biennial trade show featuring over 40 manufacturers and representatives displaying the latest and greatest products and service to

Make Your Station Safe Again!

 

Show starts Wednesday, March 29, 2017 at 9AM until 4:30PM with 6 different certification and informational seminars provided by 6 different vendors. We invite you to join us for our cocktail reception immediately following the show’s conclusion on March 29th with entertainment provided by The Bianco Martinis.

BiancoMartinis

 

 

 

 

 

 

 

 

And if you can’t make it on March 29th, we invite you to attend our half day on March 30th from 9AM to Noon!

Here is a complete list of seminars being held on March 29th:

 

8:00AM – 9:00AM:

OPW Corporate Logo

 

 

 

OPW FlexWorks Piping Certification Training Seminar
OPW Best Practices and Contractor Installation Training teaches how to properly install OPW FlexWorks Piping and covers the following topics in depth:

  • FlexWorks Component and System Overview
  • Safety Requirements and Protocol
  • Proper Handling and Storage of Materials
  • Double Wall Delivery Piping
  • Double Wall Pipe Fittings
  • Pipe and Sump Entry Fittings
  • Testing and Maintenance Criteria
  • Contractor Training Requirements
  • Successful Completion of Training Carries 2-Year Certification

 

9:15AM – 10:15AM:

Bravo Logo

 

 

 

Bravo Repair Fitting Certification
Entry Fitting Certification with cover:

  • How new regulations affect secondary containment
  • Bravo FRP retrofit certification training
  • Compliance with double wall monitored sumps.

 

10:30AM – 11:30AM:

APT FFS

 

 

 

 

APT Piping Certification Seminar
Piping Certification seminar.
VERY IMPORTANT!! In order to receive your certification for this seminar, you will be required to take an online test with Franklin Fueling. If you do not already have one, you MUST create an FFS PRO University account with Franklin Fueling PRIOR to the show using a unique email address for each tech attending. To do so, please follow the guidelines in this document, CREATE AN FFS PRO UNIVERSITY ACCOUNT

 

11:45AM – 12:45PM:

Diversified Logo

 

 

 

 

Diversified Products Repair Fitting Certification
Repair fitting certification.

 

1:00PM – 2:00PM:

Containment Solutions Logo

 

 

 

 

CSI Tank Installation Re-Certification Seminar
Tank Installation Re-Certification

 

2:30PM – 3:30PM:

GVR

 

 

 

Gilbarco EMV
Gilbarco EMV informational seminar

Registration for the show and seminars IS REQUIRED!

We plan to open online registration in the coming days. Please watch this space for further notice!

 

The John W. Kennedy Company appreciates your business and continued support!

2017 JWK Trade Show Logo

OPW Announces New DEF Mis-Filling Prevention Device

OPW Corporate Logo

 

opw-mfpdThe OPW DEF Mis-Filling Prevention Device is now available for Truck Stops and Convenience Stores.  There are countless vehicles not equipped with MFPD technology, and this device is required when magnetic DEF Nozzles are used.  Provide your customer peace of mind by stocking the MFPD in your retail outlet.

For more information, check out the official distributor bulletin.

 

The John W. Kennedy Company appreciates your business and continued support!

JWK Logo

OPW Releases Phoenix SQL Lite™

OPW Corporate Logo

opw-phoenix-sql-liteOPW Fuel Management Systems has announced the release of its new Windows-based fuel management software, Phoenix SQL Lite, for distribution.  In addition, they are also offering customers a free, fully functional 60-day trial of the software.  Phoenix SQL Lite replaces the previous OPW Phoenix programs, Phoenix Premier and Phoenix Plus, and supports the OPW FSC3000 Fuel Site Controller-based fuel control systems.  Fully compatible with Windows 7, 8, and 10, Lite is designed for easy installation on a single PC-based workstation, and its interface for OPW and third-party automatic tank gauges enables it to perform site reconciliation.  for more information, check out the Distributor Bulletin from OPW and the official product page on their site.

The John W. Kennedy Company appreciates your business and continued support!

JWK Logo

OPW Announces New FibreTite Multiport Spill Container

opw-fibretiteOPW has announced their new FibreTite Multiport Spill Containment System, which is now CARB EVR approved.  These containers are designed with a lightweight composite cover for long-term water tight performance and meet all CARB and EVR requirements, as well as being certified for use on all existing standard gasoline Phase 1 Vapor Recovery Certification Phase 1 EVR Executive Orders.  Among the features included are an integrated inspection port system, a removable flange in the container base, and a composite lift cover and optional levered plumber seal covers for easy access.

 

For additional information, check out the distributor bulletin and the official part brochure.

 

 

 

The John W. Kennedy Company appreciates your business and continued support!

JWK Logo