OPW Introduces the FibreTite Tank Sump

OPW FibreTite Tank SumpFibreTite Tank SumpsFibreTite Tank Sumps

OPW will be phasing out the FlexWorks® TSMF/TSDF tank sump series at the end of August 2018 to make way for their latest line of tank sumps.

From the engineering labs of FLEXWORKS® and FIBRELITE, OPW has made the best even better. Meet the newest member of the FibreTite Family of sumps, the most watertight sumps on the market today.

Designed to meet all the new 2018 EPA UST regulations

OPW FibreTite tank sumps function as a liquid-tight isolation container providing secondary containment for tank fittings valves, pumps and FlexWorks® or Fiberglass pipe fittings.

FibreTite provides surface access to the tank itself, as well as a clean and dry environment for future service and maintenance. The height-adjustable top-hat accommodates different tank bury depths.

Dimensions:OPW RK-5000 Resin Kit

OPW FibreTite Tank Sump DimensionsAt this time, OPW offers 10 different configurations of the FibreTite tank sump.  You can get the FibreTite tank sump in either a 42″ or 48″ diameter with a 33″ or 37″ diameter lid and a height range of 33.5″ to 53″. The sump can be configured with either a solid bottom or collar mount design.

Additional RK-5000 resin kits (sold separately) are required to attach the top hat and collar ring.  The additional quantities needed will depend on the FibreTite tank sump configuration you purchase.

The Kennedy Company’s most popular selling TSMF/TSDF series tank sump at this time is the TSMF-4536 medium burial version and will be directly replaced with the FibreTite FTSM-4233CR medium burial fiberglass tank sump with  collar ring mount, which can be found by clicking here.

View the OPW FibreTite Tank Sump catalog page.

 

If you would like to learn more about the OPW FibreTite fiberglass tank sumps, please feel free to contact us at 1.800.451.4021!

 

 

The John W. Kennedy Company appreciates your business and continued support!

JWK USA Logo

JWK Trade Show – March 29 & 30, 2017 – SAVE THE DATE!!

Yes, it is that time once again when the John W. Kennedy Company presents our biennial trade show featuring over 40 manufacturers and representatives displaying the latest and greatest products and service to

Make Your Station Safe Again!

 

Show starts Wednesday, March 29, 2017 at 9AM until 4:30PM with 6 different certification and informational seminars provided by 6 different vendors. We invite you to join us for our cocktail reception immediately following the show’s conclusion on March 29th with entertainment provided by The Bianco Martinis.

BiancoMartinis

 

 

 

 

 

 

 

 

And if you can’t make it on March 29th, we invite you to attend our half day on March 30th from 9AM to Noon!

Here is a complete list of seminars being held on March 29th:

 

8:00AM – 9:00AM:

OPW Corporate Logo

 

 

 

OPW FlexWorks Piping Certification Training Seminar
OPW Best Practices and Contractor Installation Training teaches how to properly install OPW FlexWorks Piping and covers the following topics in depth:

  • FlexWorks Component and System Overview
  • Safety Requirements and Protocol
  • Proper Handling and Storage of Materials
  • Double Wall Delivery Piping
  • Double Wall Pipe Fittings
  • Pipe and Sump Entry Fittings
  • Testing and Maintenance Criteria
  • Contractor Training Requirements
  • Successful Completion of Training Carries 2-Year Certification

 

9:15AM – 10:15AM:

Bravo Logo

 

 

 

Bravo Repair Fitting Certification
Entry Fitting Certification with cover:

  • How new regulations affect secondary containment
  • Bravo FRP retrofit certification training
  • Compliance with double wall monitored sumps.

 

10:30AM – 11:30AM:

APT FFS

 

 

 

 

APT Piping Certification Seminar
Piping Certification seminar.
VERY IMPORTANT!! In order to receive your certification for this seminar, you will be required to take an online test with Franklin Fueling. If you do not already have one, you MUST create an FFS PRO University account with Franklin Fueling PRIOR to the show using a unique email address for each tech attending. To do so, please follow the guidelines in this document, CREATE AN FFS PRO UNIVERSITY ACCOUNT

 

11:45AM – 12:45PM:

Diversified Logo

 

 

 

 

Diversified Products Repair Fitting Certification
Repair fitting certification.

 

1:00PM – 2:00PM:

Containment Solutions Logo

 

 

 

 

CSI Tank Installation Re-Certification Seminar
Tank Installation Re-Certification

 

2:30PM – 3:30PM:

GVR

 

 

 

Gilbarco EMV
Gilbarco EMV informational seminar

Registration for the show and seminars IS REQUIRED!

We plan to open online registration in the coming days. Please watch this space for further notice!

 

The John W. Kennedy Company appreciates your business and continued support!

2017 JWK Trade Show Logo